AL-MARJ 2500 UNIT HOUSING COMPLEX

Al Marj, Libya

The project is in the city of Al Marj which is located in north eastern part of Libya. It is apart of the 2500 Unit Housing Complex project. The total project area is 439 hectares. The project comprises the all infrastructure works such as sewerage and stormwater network with electric supply works including transformers, telecommunication systems with fiberoptic cabling, roads, walkways and also landscaping.

Client: ODAC-Organization for Development of Administrative Centers
Starting Date: 18.07.2007
Completion Date: 25.12.2013
Amount of Contract($): 201.700.000
KİLİS NATURAL GAS PIPELINE

Kilis, Turkey

The project is in Kilis, south west of Turkey. The project is a part of the
Turkey-Syria Natural Gas Transmission Pipeline Project. It consists of one pigging station and three valve stations. Diameter and length of the
pipes are 36" 73.300 m and 8" 1100 m. It is turnkey project including
engineering works, procurement and construction.

Client: BOTAŞ-Petrolium Pipeline Corporation
Starting Date: 16.03.2011
Completion Date: 26.12.2011
Amount of Contract($): 8.500.000

SEWERAGE AND STORMWATER DRANAIGE NETWORK OF BENGHAZİ PROJECT 207 A

Benghazi, Libya


The project is in Benghazi, north west of Libya. The project subject is
construction of 60 km.sewerage and stormwater drainage network in Benghazi.

Client: The General Building & Construction Company
Starting Date: 24.07.2006
Completion Date: 01.02.2011
Amount of Contract($): 13.000.000

KOCAELİ BAHÇECİK SEWERAGE SYSTEM

Kocaeli, Turkey

The project is in Kocaeli, which is which is third biggest industrial city
in Turkey. The projectsubject is construction of approximately 80 km.
sewerage system.

Client:General Directorate of Provincial Bank
Starting Date: 23.02.2000
Completion Date: 02.07.2008
Amount of Contract($): 11.100.000
FETHİYE SEWERAGE SYSTEM

Muğla, Turkey


The project is in Fethiye which is one of the most beautiful and popular
holiday villages of Turkey. The project subject is construction of
approximately 50 km. sewerage system.

Client: Fethiye Municipality
Starting Date: 23.05.2002
Completion Date: 17.01.2004
Amount of Contract($): 3.500.000

COLLECTION OF KONAK'S SURFACE STORM WATER

İzmir, Turkey

The project is in İzmir. The project is important because it prevents the
flood after rain.15 km. pipe was installed for the project.

Client:
İzmir Water & SewerageAdministration
Starting Date: 24.07.2001
Completion Date: 23.11.2001
Amount of Contract($): 4.800.000

INFRASTRUCTURE WORKS OF PREFABRICATED TEMPORARY RESIDENCE IN YALOVA

Yalova, Turkey

The project is in Yalova, north west of Turkey. After the earthquake in August 1999, temporary prefabricated residences were built. The project consists of construction of infrastructure needs such as sewerage and potable water system, electricity and lighting.

Client: General Directorate of Provincial Bank
Starting Date: 22.09.1999
Completion Date: 05.01.2001
Amount of Contract($): 11.800.000
G.O.P. STATE UNIVERSITY INFRASTRUCTURE WORKS OF TAŞLI ÇİFTLİK CAMPUS

Tokat, Turkey

The project is in Tokat, north central Anatolia of Turkey. The project components are construction of sewerage system, lighting works, campus roads and pavements, heating system and electricity distribution line and the transformers.

Client: G.O.P. University
Starting Date: 14.11.1994
Completion Date: 21.01.2000
Amount of Contract($): 8.000.000
PROVISION OF ENERGY FOR NATURAL GAS
PIPELINE RADIO LINK STATIONS


Marmara Region, Turkey

The project comprises the provision of electricity for natural gas pipeline radio link stations in Marmara Region

Client: BOTAŞ Corporation
Starting Date: 16.11.1999
Completion Date: 24.06.2000
Amount of Contract($): 1.500.000
ODAYERİ ADDITIONAL DISPOSAL AREA CONSTRUCTION PART I, II, III

İstanbul, Turkey

The project is in İstanbul. The project consists of three construction
phases. The purpose of the project is to enlarge the previous disposal
area by making 20 ha. additional area.

Client: İstanbul Metropolitan Municipality - Istac Inc
Starting Date: I- 31.08.2001 - II- 10.01.2003 - III- 26.03.2004
Completion Date: I- 27.03.2002 - II- 12.04.2004 - III- 29.10.2004
Amount of Contract($): I- 5.000.000 - II- 4.500.000 III- 2.700.000