DERNA AND BU MANSUR DAMS
REHABILITATION PROJECT
Derna, Libya
The project is in Derna, eastern part of Libya. The project consists of rehabilitation of two dams and constructing another third dam in between.
Client: The Secreteriat of Agricultural Reclamation and Land Development General Water Authority
Starting Date: 28.11.2007
Completion Date: 28.11.2012
Amount of Contract($): 33.100.000 |
HATAY HASSA DEMREK DAM AND IRRIGATION
Hatay, Turkey
The project is in Hatay, south east of Turkey. The purpose of the project is
irrigation. The irrigation area is 276 ha. The filling type is earthfill. Storage
volume is 2 hm³ The height is 30 m. from the groundwork and 27 m. from
the thalweg elevation 27 m.
Client: State Hydraulics Works General Directorate
Starting Date: 01.02.1997
Completion Date: 18.11.2009
Amount of Contract($): 9.300.000 |
 |
 |
AFYON SİNCANLI KIRKA DAM AND IRRIGATION
Afyon, Turkey
The project is in Afyon, west central Anatolia of Turkey. The purpose of the project is irrigation. The irrigation area is 528 ha. The filling type is earthfill. Storage volume is 2 hm3 the active capacity is 2 hm3 and inactive capacity is 0,3 hm3 The height is41 m. from the groundwork and 30 m. from the thalweg elevation 27 m.
Client: Ministry of Transport
Starting Date: 14.10.1991
Completion Date: 12.10.2000
Amount of Contract($): 8.500.000 |
ULUBORLU İLEYDAĞ DAM AND IRRIGATION
Isparta, Turkey
The project is in Isparta, south of Turkey. The purpose of the project is irrigation. The irrigation area is 120 ha. The filling type is earthfill. Storage volume is 1 hm3 the active capacity is 1 hm3 and inactive capacity is 0,1 hm3 The height is 35 m. from the groundwork and 27 m. from the thalweg elevation 27 m.
Client: State Hydraulics Works General Directorate
Starting Date: 22.11.1991
Completion Date: 27.10.1994
Amount of Contract($): 3.000.000 |
 |
 |
RUMELİ FENERİ FISHERMEN'S SHELTER
İstanbul, Turkey
The project is in Europe side of ‹stanbul. The project consists of construction of 136m. (-4m.) and 72 m. (-1m.) jetty, boat yard and rehabilitation of old jetty. 686 units of concrete blocks were produced and used. 1565 m2 backward area was paved with concrete lining.
Client: Ministry of Transport
Starting Date: 28.09.2010
Completion Date: 30.09.2011
Amount of Contract($): 2.600.000 |
AHLAT WATERSPORTS & SEABUS SHELTER
Bitlis, Turkey
The project is in Bitlis, east of Turkey. Under the scope of the project,
construction of 400 m. breakwater, 215 m. jetty and 40 m. boat yard,
85 m. floating jetty and 2 units of light houses have been completed.
Client: Ministry of Transport
Starting Date: 07.04.2006
Completion Date: 23.04.2007
Amount of Contract($): 2.550.000 |
 |
 |
KURUCAŞİLE FISHERMEN'S SHELTER
Bartın, Turkey
The project is in Bartın, Black Sea Region of Turkey. Main breakwater was
rehabilitated, 1805 concrete blocks were used for reinforcement. 260 m.
damaged part of the breakwater was renovated.
Client: Ministry of Transport
Starting Date: 22.12.2005
Completion Date: 22.12.2006
Amount of Contract($): 1.400.000 |
DOĞANYURT FISHERMEN'S SHELTER
Kastamonu, Turkey
The project is in Kastamonu, Black Sea Region of Turkey.
The project consists of rehabilitation of the main breakwater and shore works and construction of a light house.
Client: Ministry of Transport
Starting Date: 06.09.2010
Completion Date: 06.08.2012
Amount of Contract($): 5.000.000 |
 |